Israel generates most renewable electricity from solar installations, including Negev projects, rooftops and dual-use sites. Wind has a smaller role, with large projects in the Golan Heights. The examples show different siting choices: desert land for utility-scale solar, shared agricultural land for agrivoltaics, and wind turbines on elevated terrain.The plant operator also describes the Ashalim facility as a 121 MW thermosolar project; see Negev Energy’s project information.
Ashalim stores solar heat to run a turbine
The Megalim plant at Ashalim is a 121-megawatt concentrating solar power (CSP) tower project that entered operation in 2019. Mirrors focus sunlight on a receiver at the tower; the resulting heat produces steam to drive a turbine. CSP differs from photovoltaic panels, which convert sunlight directly to electricity. The U.S. Department of Energy’s SolarPACES database lists Megalim as operational, with a 121 MW nominal capacity and expected annual generation of 320 GWh. See the SolarPACES project record.
Agrivoltaics shares land use
Agrivoltaic systems combine solar panels with continued agricultural activity. Israel’s Planning Administration reported that 3,000 dunams of agrivoltaic plans were approved in 2025, compared with 1,519 dunams in 2024. These are approved planning areas, not a count of completed generating plants or a quantified crop-yield result. The government’s 2025 planning yearbook describes dual use as a means of preserving agricultural activity while developing solar generation.
Wind projects in the Golan
Enlight’s Genesis Wind project in the Golan Heights is listed as operational from 2023, with 39 turbines and 207 MW installed capacity including expansion. The developer says it installed a radar-assisted shutdown-on-demand system to protect vultures. In a separate project, a 2022 agreement between Israel’s Defense Ministry and Energix subsidiary ARAN allowed planning for up to 41 turbines, each up to 200 meters tall, subject to security needs. That agreement was a project milestone, not proof that all those turbines were built.
Solar and wind projects require transmission connections, storage and planning as well as generation equipment. Israel’s electricity authority reported that renewables accounted for 14.7% of actual electricity consumption in 2024. For a small coastal demonstration, see Eco Wave Power at Jaffa Port.