2 min read

Carlsbad: an Israeli desalination project in California

IDE Technologies helped develop the Claude “Bud” Lewis Carlsbad plant, which began commercial operation in 2015 and can produce about 50 million gallons daily. The project supplies a local source for San Diego County under a long-term purchase agreement.

Miriam Bernstein

Miriam Bernstein is the pen name of Hasbara’s Resources desk. Articles on this desk are written and published automatically by artificial intelligence, with no person reviewing them before publication.

IDE Technologies brought its seawater reverse-osmosis experience to the Claude “Bud” Lewis Carlsbad Desalination Plant in California. Commercial operations began in late 2015. The plant can produce more than 50 million gallons of drinking water per day—enough for about 400,000 people—and supplies roughly a tenth of San Diego County’s water needs.

How the plant makes a local supply

Carlsbad draws Pacific seawater at Agua Hedionda Lagoon and sends it to a treatment plant, where reverse osmosis removes salt. The San Diego County Water Authority says about half of the water entering the plant becomes drinking water; the remainder, with its salts and minerals, returns to the ocean. Its desalination overview describes the intake, production capacity, and regional role.

IDE’s project profile identifies Carlsbad as one of its seawater desalination projects. This makes the facility a concrete example of Israeli engineering deployed abroad, while its construction, permits, financing, and operation were shaped by California institutions and regulations. The plant’s IDE project page summarizes the company’s role.

Purchase agreement and environmental controls

The plant was developed as a privately owned facility selling water under a long-term purchase agreement with the Water Authority. That structure gives the region a contracted local supply, while customers remain responsible for the purchase terms; it is not accurate to say the arrangement removed costs or risks from ratepayers. The contract price depends on the quantity purchased and electricity costs, according to the Water Authority.

Carlsbad’s intake and brine discharge operate under permits and environmental requirements. The San Diego Regional Water Quality Control Board says the plant produces brine about twice the salinity of ocean water and discharges it through a channel shared with the Encina Power Station. Its regulatory project page describes current operations and the proposed intake and dilution arrangements following power-station decommissioning. The existence of monitoring and permit conditions is not proof of zero environmental effect; it gives regulators a basis to set limits and assess compliance.

Carlsbad’s lesson is practical: large-scale desalination can add a dependable local source, but the region must weigh its contracted price, energy use, intake design, and discharge controls. Israel’s own network faces the same engineering questions at a different scale; see Sorek B and Israel’s plant system.

Sources

  1. 1.https://www.sdcwa.org/your-water/local-water-supplies/seawater-desalination/
  2. 2.https://ide-tech.com/en/project/carlsbad-desalination-plant/
  3. 3.https://www.waterboards.ca.gov/sandiego/water_issues/programs/regulatory/carlsbad_desalination.html

Accessibility

These settings are saved on this device.

Preview

Read clearly, your way

Adjust this page while you read. Explore resources

Text
Text sizeApplies across the site.
Colour and contrast
Theme
Motion
AnimationsMatch device follows your reduced motion setting.