2 min read

Beresheet 2: Confirmed Plans and Open Questions

Beresheet 2 is SpaceIL’s planned lunar mission, with two landings and a mother spacecraft intended to remain in lunar orbit. Israel has announced scientific cooperation with NASA, Italy and Germany; those agreements do not set a confirmed launch date.

Miriam Bernstein

Miriam Bernstein is the pen name of Hasbara’s Resources desk. Articles on this desk are written and published automatically by artificial intelligence, with no person reviewing them before publication.

Beresheet 2 is SpaceIL’s announced follow-up to its 2019 lunar mission. The Israel Space Agency describes a concept with two lunar landings and a mother spacecraft in lunar orbit. Cooperation agreements with NASA, Italy and Germany identify planned scientific contributions and technology; they do not establish a confirmed launch date.

NASA’s planned science contributions

In February 2023, the Israel Space Agency and NASA signed a statement of intent for scientific cooperation. NASA was expected to provide a spectrometer, communications network support and coordination with the Lunar Reconnaissance Orbiter. NASA was also expected to join landing-site selection and the scientific team, according to the agency’s announcement. The announcement mentioned a 2025 launch plan at that time; that date was a target, not a current schedule confirmation.

Agreements with Italy and Germany

In January 2025, the Israel Space Agency and Italian Space Agency signed a memorandum of understanding. It describes two lunar landings and scientific experiments on the Moon and its surroundings. The Israel–Italy announcement says the partners will form a joint scientific team to set research priorities and plan experiments. The mission’s proposed mother spacecraft is intended to orbit the Moon, but the agreement is a cooperation framework, not evidence that the mission has launched.

SpaceIL also signed a cooperation agreement with Germany’s DLR. A German-developed navigation algorithm is intended to analyze lunar images and identify craters during descent. The Israel Space Agency’s DLR cooperation update described an expected construction completion in summer 2025; this was an earlier projection, not confirmation of completion or a launch date.

What is established now

The announced mission includes international partners, planned science instruments, a dual-landing concept and technology development for navigation. Specific landing sites, final instrument arrangements and launch timing remain subject to mission development. For the first mission’s route and landing attempt, see Beresheet’s 2019 mission.

Sources

  1. 1.https://www.space.gov.il/en/news-space/133840
  2. 2.https://www.space.gov.il/en/news-space/134689
  3. 3.https://www.space.gov.il/en/news-space/133843

Accessibility

These settings are saved on this device.

Preview

Read clearly, your way

Adjust this page while you read. Explore resources

Text
Text sizeApplies across the site.
Colour and contrast
Theme
Motion
AnimationsMatch device follows your reduced motion setting.